Arrowhead Ranch Effluent Pipeline Condition Assessment
|
|||||||||||||
Glendale Project #: 111215 |
|||||||||||||
CURRENT PROJECT SCHEDULE |
|||||||||||||
| Project Manager:Jim McMains | Council District(s): Sahuaro | ||||||||||||
| Design Consultant:Black & Veatch | Department: WATER / SEWER | ||||||||||||
| Project Contractor: Contractor Not Determined | |||||||||||||
|
|||||||||||||
Project Description:
The purpose of this project is to assess the condition of
approximately 14,300 feet of effluent pipeline emanating from the Arrowhead
Ranch Water Reclamation Facility (ARWRF) and identify rehabilitation
alternatives as necessary. Additionally, the existing recharge well control
systems at ARWRF need to be assessed and modified as necessary.
|
|||||||||||||
Project Status:
03-05-2013: Black & Veatch was selected to
perform assessment and design and construction administration services if
applicable. Preparation for the pipeline inspection is underway with video
& leak assessment scheduled to begin March 18th.
|
|||||||||||||
Schedule Variance Explanation: |
|||||||||||||