CURRENT PROJECT SCHEDULE
Project Manager:Jim McMains Council District(s): Sahuaro
Design Consultant:Black & Veatch Department: WATER / SEWER
Project Contractor: Contractor Not Determined

Start DESIGN SCHEDULE Finish
10/2012  90%  06/2013
Start CONSTRUCTION SCHEDULE Finish
  No Construction Phase   

Project Description:
The purpose of this project is to assess the condition of approximately 14,300 feet of effluent pipeline emanating from the Arrowhead Ranch Water Reclamation Facility (ARWRF) and identify rehabilitation alternatives as necessary. Additionally, the existing recharge well control systems at ARWRF need to be assessed and modified as necessary.

Project Status:
03-05-2013: Black & Veatch was selected to perform assessment and design and construction administration services if applicable. Preparation for the pipeline inspection is underway with video & leak assessment scheduled to begin March 18th.